CATALÀ · ESPAÑOL · ENGLISH · DEUTSCH

02.08.2010 - 25.08.2010

Reform of air conditioning network at Hospital Universitari Josep Trueta




To improve comfort and quality of air for air conditioning in Emergency operating rooms, we have taken the following actions:

-It has been improved the system of absolute filters for filtering the air conditioning at emergency operating rooms.

-New gates have been installed to control the flow  of air conditioning for that same network.

-For the outpatient operating room, an air conditioner is being installed separately from the rest.


BIGAS ALSINA, S.A.

B. Pedret - Mas Coll, s/n · Apartat 136 · 17080 Girona


T. (+34) 972 206 932 · F. (+34) 972 213 702

e-mail: bigasalsina@bigasalsina.com